Train Service Performance at Huyton - February 2012

DateScheduledTrains RunOn TimeWithin 5 min.Comments
1163163(100.0%)147(90.2%)161(98.8%) 
2163163(100.0%)144(88.3%)158(96.9%) 
3165164(99.4%)122(73.9%)159(96.4%) 
4164162(98.8%)119(72.6%)139(84.8%) 
55858(100.0%)40(69.0%)52(89.7%) 
6162161(99.4%)129(79.6%)152(93.8%) 
7162162(100.0%)136(84.0%)157(96.9%) 
8162161(99.4%)121(74.7%)150(92.6%) 
9162161(99.4%)125(77.2%)152(93.8%) 
10164164(100.0%)130(79.3%)152(92.7%) 
11164164(100.0%)132(80.5%)157(95.7%) 
125959(100.0%)49(83.1%)53(89.8%) 
13161161(100.0%)117(72.7%)140(87.0%) 
14161161(100.0%)138(85.7%)158(98.1%) 
15161161(100.0%)132(82.0%)149(92.5%) 
16161161(100.0%)117(72.7%)151(93.8%) 
17164163(99.4%)108(65.9%)150(91.5%) 
1800(-%)0(-%)0(-%) The first of a series of weekends with no trains at all.
1900(-%)0(-%)0(-%) 
20164164(100.0%)100(61.0%)124(75.6%) A signalling problem at Huyton delayed services between 07:00 and 10:30.
A bridge strike in St Helens affected services between 15:30 and 17:30.
21163162(99.4%)115(70.6%)148(90.8%) 
22163162(99.4%)135(82.8%)154(94.5%) 
23163162(99.4%)103(63.2%)139(85.3%) 
24164163(99.4%)115(70.1%)150(91.5%) 
2500(-%)0(-%)0(-%) 
2600(-%)0(-%)0(-%) 
27163162(99.4%)143(87.7%)158(96.9%) 
28163163(100.0%)134(82.2%)161(98.8%) 
29163163(100.0%)132(81.0%)159(97.5%) 
February38623850(99.7%)2983(77.2%)3583(92.8%) 

Notes
  1. The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
  2. Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.