nw-sparks.co.uk

©2017 Phil Wieland

Train Service Performance at Huyton - October 2012

DateScheduledTrains RunOn TimeWithin 5 min.Comments
1158154(97.5%)99(62.7%)137(86.7%) Signalling problem at Edge Hill. 11:00 - 13:00.
2157157(100.0%)136(86.6%)154(98.1%) 
3157155(98.7%)123(78.3%)150(95.5%) 
4157156(99.4%)122(77.7%)144(91.7%) 
5164161(98.2%)105(64.0%)150(91.5%) Incident at Poulton-le-Fylde. 12:50 - 14:20
6164162(98.8%)108(65.9%)139(84.8%) 
75656(100.0%)35(62.5%)48(85.7%) 
8158157(99.4%)132(83.5%)149(94.3%) 
9157155(98.7%)118(75.2%)143(91.1%) 
10157157(100.0%)137(87.3%)153(97.5%) 
11157157(100.0%)134(85.4%)154(98.1%) 
12164164(100.0%)102(62.2%)156(95.1%) 
13164163(99.4%)88(53.7%)149(90.9%) 
145656(100.0%)38(67.9%)46(82.1%) 
15157155(98.7%)112(71.3%)144(91.7%) 
16157157(100.0%)128(81.5%)154(98.1%) 
17157156(99.4%)124(79.0%)146(93.0%) 
18158157(99.4%)139(88.0%)153(96.8%) 
19164163(99.4%)115(70.1%)140(85.4%) 
20164164(100.0%)143(87.2%)162(98.8%) 
215656(100.0%)50(89.3%)56(100.0%) 
22157148(94.3%)121(77.1%)146(93.0%) 
23157157(100.0%)123(78.3%)148(94.3%) 
24157155(98.7%)113(72.0%)143(91.1%) 
25157156(99.4%)124(79.0%)150(95.5%) 
26164164(100.0%)115(70.1%)150(91.5%) 
27163161(98.8%)94(57.7%)135(82.8%) 
285757(100.0%)37(64.9%)48(84.2%) 
29157157(100.0%)99(63.1%)143(91.1%) 
30157153(97.5%)74(47.1%)116(73.9%) Broken down train on the up line at Thatto Heath caused delays and some cancellations. 13:00 - 17:00.
31157157(100.0%)85(54.1%)123(78.3%) 
October45224483(99.1%)3273(72.4%)4129(91.3%) 

Notes
  1. The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
  2. Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.