Train Service Performance at Huyton - January 2013

DateScheduledTrains RunOn TimeWithin 5 min.Comments
1130130(100.0%)122(93.8%)128(98.5%) 
2157157(100.0%)133(84.7%)152(96.8%) 
3158157(99.4%)113(71.5%)141(89.2%) 
4164164(100.0%)119(72.6%)145(88.4%) 
5164164(100.0%)141(86.0%)152(92.7%) 
65656(100.0%)50(89.3%)53(94.6%) 
7157157(100.0%)125(79.6%)149(94.9%) 
8157157(100.0%)133(84.7%)146(93.0%) 
9157157(100.0%)127(80.9%)153(97.5%) 
10157156(99.4%)125(79.6%)146(93.0%) 
11164163(99.4%)133(81.1%)154(93.9%) 
12164164(100.0%)151(92.1%)162(98.8%) 
135656(100.0%)39(69.6%)47(83.9%) 
14157157(100.0%)128(81.5%)143(91.1%) A signalling problem at Eccles caused mostly minor delays between the start of service and 09:00.
15159152(95.6%)119(74.8%)135(84.9%) There were a number of delays and cancellations in the morning peak for which no reason was given.
A broken down train on the down line near St Helens Central caused disruption from 20:30 until the end of service.
16157157(100.0%)118(75.2%)141(89.8%) 
17157157(100.0%)116(73.9%)141(89.8%) 
18164163(99.4%)123(75.0%)145(88.4%) 
19164164(100.0%)134(81.7%)159(97.0%) 
205656(100.0%)51(91.1%)56(100.0%) 
21157157(100.0%)125(79.6%)143(91.1%) 
22157157(100.0%)116(73.9%)139(88.5%) 
23160147(91.9%)112(70.0%)131(81.9%) ECS train 5Z47 derailed at Ordsall Lane Junction. No service between Manchester Victoria and Liverpool from 15:00.
24166157(94.6%)100(60.2%)127(76.5%) No service between Manchester Victoria and Liverpool all day.
25165157(95.2%)86(52.1%)128(77.6%) No service between Manchester Victoria and Liverpool until about 16:00.
26165132(80.0%)93(56.4%)118(71.5%) Overhead wire problem at Euxton. No trains between Preston and Wigan all day.
275656(100.0%)41(73.2%)49(87.5%) 
28157131(83.4%)109(69.4%)125(79.6%) Live departure boards were out of action between approximately 18:20 and 22:00. I have assumed all trains were on time during this period.
29157157(100.0%)125(79.6%)148(94.3%) 
30157156(99.4%)106(67.5%)142(90.4%) 
31157154(98.1%)107(68.2%)138(87.9%) 
January45094405(97.7%)3420(75.8%)4036(89.5%) 

Notes
  1. The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
  2. Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.