nw-sparks.co.uk

©2024 Phil Wieland

Train Service Performance at Huyton - October 2013

DateScheduledTrains RunOn TimeWithin 5 min.Comments
01159158(99.3%)126(79.2%)155(97.4%) 
02159159(100.0%)133(83.6%)152(95.5%) 
03159159(100.0%)149(93.7%)157(98.7%) 
04165165(100.0%)137(83.0%)161(97.5%) 
05164163(99.3%)131(79.8%)152(92.6%) 
065655(98.2%)43(76.7%)48(85.7%) 
07160160(100.0%)128(80.0%)152(95.0%) 
08160160(100.0%)127(79.3%)151(94.3%) 
09160160(100.0%)124(77.5%)143(89.3%) 
10160160(100.0%)133(83.1%)157(98.1%) 
11166166(100.0%)152(91.5%)165(99.3%) 
12164163(99.3%)153(93.2%)161(98.1%) 
135656(100.0%)44(78.5%)54(96.4%) 
14160160(100.0%)149(93.1%)157(98.1%) 
15160159(99.3%)133(83.1%)149(93.1%) 
16160160(100.0%)122(76.2%)148(92.5%) 
17160160(100.0%)133(83.1%)153(95.6%) 
18166166(100.0%)122(73.4%)160(96.3%) 
19165164(99.3%)121(73.3%)149(90.3%) 
205656(100.0%)34(60.7%)42(75.0%) 
21160157(98.1%)118(73.7%)143(89.3%) 
22160160(100.0%)103(64.3%)147(91.8%) 
23160160(100.0%)129(80.6%)152(95.0%) 
24160160(100.0%)130(81.2%)158(98.7%) 
25167167(100.0%)118(70.6%)148(88.6%) 
26164163(99.3%)129(78.6%)152(92.6%) 
275656(100.0%)43(76.7%)52(92.8%) 
28160160(100.0%)114(71.2%)143(89.3%) 
29160160(100.0%)123(76.8%)148(92.5%) 
30160160(100.0%)119(74.3%)146(91.2%) 
31160160(100.0%)92(57.5%)131(81.8%) 
Month45824572(99.7%)3612(78.8%)4286(93.5%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence, and also from the public live departure board systems.
  2. Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.