Train Service Performance at Huyton - November 2014

DateScheduledTrains RunOn TimeWithin 5 min.Comments
Saturday 01163159(97.5%)88(53.9%)113(69.3%) 
Sunday 025555(100.0%)41(74.5%)49(89.0%) 
Monday 03157157(100.0%)102(64.9%)138(87.8%) 
Tuesday 04157157(100.0%)101(64.3%)145(92.3%) 
Wednesday 05157157(100.0%)113(71.9%)144(91.7%) 
Thursday 06157157(100.0%)95(60.5%)134(85.3%) 
Friday 07162162(100.0%)94(58.0%)139(85.8%) 
Saturday 08163163(100.0%)105(64.4%)150(92.0%) 
Sunday 096161(100.0%)53(86.8%)58(95.0%) 
Monday 10157157(100.0%)116(73.8%)134(85.3%) 
Tuesday 11157153(97.4%)99(63.0%)131(83.4%)Emergency services dealing with an incident resulted in delays and cancellations between 14:45 and 16:30.
Wednesday 12157150(95.5%)78(49.6%)107(68.1%)Overrunning engineering works at Eccles wrecked early services, with a number of cancellations and delays through until after 09:00.
Thursday 13157157(100.0%)93(59.2%)121(77.0%) 
Friday 14162158(97.5%)70(43.2%)116(71.6%) 
Saturday 15164164(100.0%)101(61.5%)128(78.0%) 
Sunday 166161(100.0%)53(86.8%)59(96.7%) 
Monday 17157155(98.7%)97(61.7%)131(83.4%) 
Tuesday 18157154(98.0%)106(67.5%)127(80.8%) 
Wednesday 19157153(97.4%)103(65.6%)139(88.5%) 
Thursday 20157157(100.0%)109(69.4%)143(91.0%) 
Friday 21162161(99.3%)69(42.5%)116(71.6%) 
Saturday 22163163(100.0%)96(58.8%)134(82.2%) 
Sunday 236161(100.0%)51(83.6%)59(96.7%) 
Monday 24157157(100.0%)106(67.5%)140(89.1%) 
Tuesday 25157157(100.0%)118(75.1%)140(89.1%) 
Wednesday 26157157(100.0%)112(71.3%)138(87.8%) 
Thursday 27160142(88.7%)75(46.8%)101(63.1%)An "operating incident" (Actually a derailment within the engineering possession.) closed the railway at Bryn for most of the day, resulting in cancellations and diversions via Newton.
Friday 28162162(100.0%)106(65.4%)140(86.4%) 
Saturday 29163160(98.1%)103(63.1%)146(89.5%) 
Sunday 306159(96.7%)48(78.6%)52(85.2%) 
Month42784226(98.7%)2753(64.3%)3624(84.7%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.