Train Service Performance at Huyton - February 2018

DateScheduledTrains RunOn TimeWithin 5 min.Comments
Thursday 01160160(100.0%)116(72.5%)155(96.8%) 
Friday 02162160(98.7%)108(66.6%)143(88.2%)A broken down train at Edge Hill caused delays and cancellations between 18:00 and 21:00.
Saturday 03163163(100.0%)115(70.5%)156(95.7%) 
Sunday 048282(100.0%)66(80.4%)77(93.9%) 
Monday 05160160(100.0%)122(76.2%)150(93.7%) 
Tuesday 06160160(100.0%)128(80.0%)153(95.6%) 
Wednesday 07160160(100.0%)113(70.6%)148(92.5%) 
Thursday 08160157(98.1%)95(59.3%)127(79.3%) 
Friday 09163155(95.0%)106(65.0%)138(84.6%)Overhead wire problems and a broken down train in the Broad Green area resulted in delays and cancellations between 10:30 and 13:00.
Saturday 10163163(100.0%)115(70.5%)155(95.0%) 
Sunday 118282(100.0%)65(79.2%)81(98.7%) 
Monday 12162162(100.0%)107(66.0%)146(90.1%) 
Tuesday 13162162(100.0%)114(70.3%)150(92.5%) 
Wednesday 14162162(100.0%)116(71.6%)145(89.5%) 
Thursday 15162160(98.7%)106(65.4%)147(90.7%) 
Friday 16164151(92.0%)95(57.9%)126(76.8%)Services from 16:00 to 19:00 were substantially disrupted by a track circuit failure at Lime Street.
Saturday 17160160(100.0%)105(65.6%)147(91.8%) 
Sunday 188282(100.0%)66(80.4%)77(93.9%) 
Monday 19162161(99.3%)128(79.0%)154(95.0%) 
Tuesday 20162160(98.7%)113(69.7%)138(85.1%)An unexploded WW2 bomb found near St Helens Junction disrupted services around 13:00 to 14:00.
Wednesday 21162157(96.9%)107(66.0%)132(81.4%)A signalling problem at Liverpool Lime Street caused delays and cancellations from 12:00 until 14:00.
Thursday 22162157(96.9%)125(77.1%)147(90.7%) 
Friday 23162161(99.3%)118(72.8%)155(95.6%) 
Saturday 24163163(100.0%)121(74.2%)159(97.5%) 
Sunday 258280(97.5%)66(80.4%)78(95.1%) 
Monday 26162161(99.3%)119(73.4%)153(94.4%) 
Tuesday 27163149(91.4%)105(64.4%)122(74.8%) 
Wednesday 28162158(97.5%)87(53.7%)121(74.6%) 

  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.