Train Service Performance at Huyton - October 2018

DateScheduledTrains RunOn TimeWithin 5 min.Comments
Monday 01170160(94.1%)103(60.5%)135(79.4%) 
Tuesday 02170164(96.4%)121(71.1%)155(91.1%) 
Wednesday 03172165(95.9%)125(72.6%)152(88.3%) 
Thursday 04173166(95.9%)128(73.9%)146(84.3%) 
Friday 05176160(90.9%)109(61.9%)143(81.2%) 
Saturday 065252(100.0%)25(48.0%)32(61.5%) 
Sunday 076458(90.6%)13(20.3%)43(67.1%) 
Monday 08170166(97.6%)130(76.4%)158(92.9%) 
Tuesday 09170165(97.0%)115(67.6%)147(86.4%) 
Wednesday 10169166(98.2%)114(67.4%)143(84.6%) 
Thursday 11169167(98.8%)110(65.0%)134(79.2%) 
Friday 12172167(97.0%)59(34.3%)101(58.7%) 
Saturday 134242(100.0%)24(57.1%)34(80.9%) 
Sunday 146459(92.1%)37(57.8%)48(75.0%) 
Monday 15170165(97.0%)91(53.5%)129(75.8%) 
Tuesday 16170169(99.4%)96(56.4%)138(81.1%) 
Wednesday 17171136(79.5%)70(40.9%)97(56.7%)Damage to the OHLE between St Helens and Wigan caused delays, cancellations and diversions between 09:00 and 17:00.
Thursday 18170166(97.6%)113(66.4%)140(82.3%) 
Friday 19171168(98.2%)101(59.0%)129(75.4%) 
Saturday 203838(100.0%)28(73.6%)36(94.7%) 
Sunday 216363(100.0%)31(49.2%)49(77.7%) 
Monday 22173168(97.1%)104(60.1%)131(75.7%) 
Tuesday 23175168(96.0%)95(54.2%)134(76.5%) 
Wednesday 24175160(91.4%)99(56.5%)140(80.0%) 
Thursday 25174169(97.1%)85(48.8%)122(70.1%) 
Friday 26173159(91.9%)75(43.3%)108(62.4%)A points failure between Liverpool Lime Street and Huyton caused delays and cancellations between 13:00 and 18:00.
Saturday 272828(100.0%)12(42.8%)24(85.7%) 
Sunday 286356(88.8%)30(47.6%)47(74.6%) 
Monday 29174160(91.9%)86(49.4%)114(65.5%)A points failure on the down line between Wavertree and Edge Hill resulted in delays and cancellations between 06:30 and 09:00.
Tuesday 30172169(98.2%)106(61.6%)137(79.6%) 
Wednesday 31172168(97.6%)127(73.8%)148(86.0%) 
Month43654167(95.4%)2760(63.2%)3592(82.2%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.