nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sat 2nd June 2012 to Mon 4th June 2012
Engineering Work Between Earlestown and Warrington Bank Quay

From 11:00 on Saturday until 11:00 on Monday:
Trains between Manchester Piccadilly and Llandudno are diverted between Manchester Piccadilly and Chester and will not call at Manchester Oxford Road, Newton-le-Willows, Earlestown, Warrington Bank Quay, Runcorn East, Frodsham and Helsby,

Buses replace Liverpool - Warrington trains between Earlestown and Warrington Bank Quay. [100]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.