nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Tue 20th August 2013 to Fri 23rd August 2013
Overnight Engineering Works

03:38 Liverpool Lime Street to Manchester Airport is replaced by bus between Manchester Piccadilly and Manchester Airport.
04:38 Manchester Airport to Liverpool Lime Street is replaced by bus between Manchester Airport and Manchester Piccadilly departing at 04:15. [170]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.