nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 16th December 2013 to Fri 20th December 2013
Overnight Engineering Works

Monday to Thursday

22:34 Stockport to Wigan Wallgate will terminate at Bolton. A replacement bus service will run from Bolton to Wigan Wallgate.
23:20 Manchester Victoria to Wigan Wallgate will not run. A replacement bus service will operate throughout.

Monday to Friday

04:56 Blackpool North to Colne will start at Preston. A replacement bus service will run from Blackpool North to Preston at 04:15. [176]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.