nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sun 9th March 2014
Work Between Helsby and Chester until 16:40

Arriva Trains Wales services will be diverted and not call at stations between Manchester Piccadilly and Chester, buses will run calling at all stations normally served by the train. [190]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.