nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 21st April 2014 to Thu 24th April 2014
Overnight Engineering Works

22:34 Stockport to Wigan Wallgate terminates at Bolton and is replaced by a bus between Bolton and Wigan Wallgate.
23:05 Huddersfield to Manchester Victoria. This train terminates at Stalybridge and is replaced by a bus between Stalybridge and Manchester Victoria
23:20 Manchester Victoria to Wigan Wallgate. This train will not call at Salford Crescent, Swinton, Moorside, Walkden, Atherton, Hag Fold, Daisy Hill, Hindley or Ince. A replacement bus will operate from Manchester Victoria to Wigan Wallgate, calling at these stations. [200]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.