nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Mon 14th July 2014 to Fri 18th April 2014
Overnight Engineering Works

Monday to Thursday

04:52 Blackpool North to Colne. This train will start forward from Preston. A bus will operate from Blackpool North to Preston, departing Blackpool North at 04:10 to connect into the train at Preston.
05:26 St Annes-on-the-Sea to Colne. This train will start from Blackpool North and will not call at Ansdell & Fairhaven, Lytham or Moss Side.
22:34 Stockport to Wigan Wallgate. This train terminates at Bolton and is replaced by a bus between Bolton and Wigan Wallgate.
23:06 Huddersfield to Manchester Victoria. This train terminates at Stalybridge and is replaced by a bus between Stalybridge and Manchester Victoria.
23:20 Manchester Victoria to Wigan Wallgate. This train will not call at Salford Crescent, Swinton, Moorside, Walkden, Atherton, Hag Fold, Daisy Hill, Hindley or Ince. A bus will operate from Manchester Victoria to Wigan Wallgate, calling at the affected stations

Tuesday to Friday

An additional train will operate from Blackpool North to Blackburn, departing Blackpool North at 05:01 and calling at Preston only. [215]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.