Engineering Works Detail

Mon 2nd February 2015 to Thu 5th February 2015
Overnight Engineering Works

Monday:
04:52 Blackpool North to Colne, bus replaces train between Blackpool North and Preston.
05:19 Blackpool South to Colne will start from Blackpool North, a bus will run from Blackpool South to Preston.

Monday to Thursday:
23:09 Manchester Victoria to Liverpool Lime Street and 23:19 Liverpool Lime Street to Manchester Victoria, buses replace trains throughout. [268]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.