nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Sat 27th December 2014 to Sun 28th December 2014
Lines Closed Between Edge Hill and Earlestown and St Helens Central

First TransPennine Express trains will not run between Liverpool Lime Street and Manchester Victoria and will start / terminate at Manchester Piccadilly.

Saturday

Buses replace trains between Liverpool Lime Street and Earlestown / St Helens Central.

The following early morning trains will not run:

05:56 Warrington Bank Quay to Ellesmere Port.
06:19 / 06:56 Ellesmere Port to Helsby.
06:33 Helsby to Ellesmere Port.

Sunday

Buses replace trains between Liverpool Lime Street and Manchester Oxford Road / St Helens Central.
Trains between Liverpool Lime Street and Manchester Airport are diverted between Liverpool Lime Street and Manchester Oxford Road running non stop. [269]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.