nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Tue 31st March 2015 to Fri 3rd April 2015
Overnight Engineering Works

03:38 Liverpool Lime Street to Manchester Airport and 04:38 Manchester Airport to Liverpool Lime Street are replaced by buses throughout. [285]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.