Engineering Works Detail

Sat 12th December 2015 to Mon 14th December 2015
Farnworth Tunnel Final Works

The line from Bolton to Manchester through Farnworth Tunnel will be completely closed on Saturday 12 and Sunday 13 December.

The normal timetable will resume on Monday 14 December, except that on the first Monday the 03:37 Blackpool North to Manchester Airport will be diverted and will not call at Bolton. [341]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.