nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 29th February 2016 to Fri 4th March 2016
Overnight Engineering Works

04:52 Blackpool North to Colne will start at Preston.
05:19 Blackpool South to Colne will start from Blackpool North. [348]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.