nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Tue 19th April 2016 to Fri 22nd April 2016
Overnight Engineering Works

The 04:47 Blackpool North to Manchester Airport service will be diverted and will not call at Chorley or Horwich Parkway. A replacement bus will run from Preston to Bolton via Chorley and Horwich Parkway.
The 04:52 Blackpool North to Colne service will start from Blackburn. A bus will be provided from Preston to Colne, connecting out of the 04:47 Blackpool North to Manchester Airport service. [359]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.