Engineering Works Detail
Sun 8th May 2016 Engineering Works West Of Manchester
Arriva Trains Wales
Trains between Manchester and Chester will be diverted via Stockport and Northwich.
First TransPennine Express
Trains between Manchester Airport and Blackpool North will be diverted to start / terminate at Manchester Victoria and will not call at stations between Manchester Airport and Deansgate.
Northern
Trains between Manchester Airport and Liverpool Lime Street will be diverted to run between Liverpool and Wigan North Western via Earlestown.
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.
Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.
|