nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 8th August 2016 to Tue 9th August 2016
Overnight Engineering Works

Monday

The 04:52 Blackpool North to Colne service is replaced by a bus between Blackpool North and Preston

Monday and Tuesday

The 23:06 Huddersfield to Manchester Victoria service will be replaced by a bus between Stalybridge and Manchester Victoria.
The 22:42 Preston to Liverpool Lime Street services will be replaced by a bus.
The 23:09 Manchester Victoria to Liverpool Lime Street service will run earlier than the normal timetable. A bus will also run at 23:09 from Manchester Victoria.

Tuesday

The 05:19 Blackpool South to Colne will start from Blackpool North. A replacement bus service will run between Blackpool South and Preston. [382]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.