nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sun 9th October 2016
Lines Through Deansgate Junction Closed

Buses replace trains between Manchester Piccadilly and Chester via Newton-le-Willows.
Southport - Chester / Hazel Grove services will be amended. They will run between Southport and Manchester Victoria, and between Manchester Oxford Road and Chester / Hazel Grove.
Barrow-in-Furness / Blackpool North - Manchester Airport services will be amended. They will run between Barrow-in-Furness / Blackpool North and Manchester Victoria, and between Manchester Oxford Road and Manchester Airport.
Manchester Oxford Road - Liverpool Lime Street services will be replaced by buses between Manchester Oxford Road and Urmston.
Manchester Airport - Liverpool Lime Street services will run between Manchester Victoria and Liverpool Lime Street. [391]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.