nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Sat 12th November 2016 to Sun 13th November 2016
Overnight Engineering Works

Saturday evening:
The 21:47 Liverpool Lime Street to Blackpool North and the 23:02 Liverpool Lime Street to Preston will terminate at Wigan North Western.

Sunday morning:
The 09:00 Blackpool North to Liverpool Lime Street will start from Wigan North Western. [397]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.