nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Sat 24th September 2011 to Sun 25th September 2011
Engineering Work Between Wigan North Western and Preston

Saturday
22:14 Blackpool North to Liverpool Lime Street will depart Blackpool North at the earlier time of 22:08.
23:02 Liverpool Lime Street to Preston will terminate at Wigan Wallgate with a connecting bus from Wigan North Western to Preston.

Sunday
Buses replace trains between Wigan North Western and Preston until 15:00. [40]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.