nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 19th December 2016 to Fri 23rd December 2016
Lines Closed At Ordsall Lane Junction

Arriva Trains Wales services between Manchester and Chester will start and terminate at Warrington
Bank Quay.

Trains between Manchester Airport and Blackpool North /
Barrow-in-Furness / Southport will be diverted to start from Manchester
Victoria.

Trains between Blackpool North / Southport and Hazel Grove / Chester will
terminate at Manchester Victoria. Trains will be restarted from Manchester
Oxford Road.

Trains between Manchester Airport and Liverpool Lime Street will not run.

Trains between Manchester Victoria and Liverpool Lime Street will start from
and terminate at Eccles.

TransPennine Express trains between Newcastle / York and Liverpool Lime Street will terminate at
Manchester Victoria.

Trains between Manchester Airport and Glasgow Central will start from Preston.

Trains between Manchester Airport and Edinburgh will operate to a limited
reduced frequency timetable and will either run from Manchester Victoria (via Chorley) or
Preston.

On Thursday and Friday, services between Liverpool Lime Street and Newcastle
will operate between Leeds and Newcastle only. [406]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.