nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Mon 23rd January 2017 to Tue 17th January 2017
Overnight Engineering Works

The 23:06 Huddersfield to Manchester Victoria service will terminate at Stalybridge.

The 22:42 Preston to Liverpool Lime Street will not run.

The 23:09 Manchester Victoria to Liverpool Lime Street will run earlier than normal, leaving Victoria at 22:33. [412]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.