nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sun 7th May 2017
Works at Manchester Victoria

Northern train services between Manchester Victoria and Clitheroe, Wigan Wallgate, and Blackpool North will start / terminate at Manchester Oxford Road.

TransPennine Express trains between Liverpool Lime Street and Newcastle will be diverted to start from / terminate at Manchester Piccadilly and will not call at Manchester Victoria or Liverpool Lime Street. [439]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.