Sun 25th June 2017
Lines Closed Through Salford Crescent Before 09:40 and After 20:00

Trains which usually run between Manchester Airport and Preston / Blackpool North will be diverted via Wigan North Western.
Trains which usually run between Manchester Victoria and Preston / Blackpool North will start from Bolton.
Trains which usually run between Southport and Stockport / Chester will terminate at Wigan Wallgate, and start from Manchester Oxford Road. [440]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.