nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 3rd July 2017 to Thu 6th July 2017
Overnight Engineering Works

The 21:29 Manchester Airport to Preston will not run.
The 22:45 Blackpool North to Manchester Airport service will terminate at Preston.
The 23:09 Manchester Victoria to Liverpool Lime Street will not run.
The 23:19 Liverpool Lime Street to Manchester Victoria will not run.
The 23:30 Manchester Airport to Preston service will terminate at Manchester Piccadilly. [442]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.