nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Mon 24th July 2017 to Fri 28th July 2017
Overnight Engineering Works

The 21:21 Blackpool North to Manchester Victoria service will be replaced by a bus between Preston and Manchester Victoria.
The 21:22 Southport to Manchester Victoria service will not call at Hindley, Daisy Hill or Salford Crescent, so is presumably diverted via Golborne Jn.
The 22:18 Southport to Manchester Victoria service will be replaced by a bus between Wigan Wallgate and Manchester Victoria.
The 22:20 Manchester Airport to Southport service will not call at Salford Crescent, Daisy Hill or Hindley, so is presumably diverted via Golborne Jn.
The 22:21 Blackpool North to Manchester Victoria service will be replaced by a bus between Preston and Manchester Victoria.
The 22:23 Manchester Victoria to Preston service will be replaced by a bus.
The 22:30 Wigan Wallgate to Manchester Victoria service will be replaced by a bus.
The 22:34 Stockport to Wigan Wallgate service will not call at Salford Crescent, Daisy Hill or Hindley.
The 22:45 Manchester Victoria to Wigan North Western service will be replaced by a bus.
The 23:17 Manchester Victoria to Preston service will be replaced by a bus.
The 23:20 Manchester Victoria to Wigan Wallgate service will be replaced by bus.
The 23:38 Liverpool Lime Street to Manchester Piccadilly service will be replaced by a bus.
The 23:42 Preston to Manchester Victoria service will be replaced by a bus. [447]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.