nw-sparks.co.uk

©2018 Phil Wieland

Engineering Works Detail

Mon 16th April 2018 to Sun 29th April 2018
Reduced Service at Blackpool North

Following the extended winter closure there will be a phased re-introduction of train services. Details are provisional at this time. [504]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.