nw-sparks.co.uk

©2018 Phil Wieland

Engineering Works Detail

Sat 23rd February 2019 to Sun 24th February 2019
Overnight Engineering Work At Euxton Junction



From: garnerd build ZB12
Role: Rail inc.
Server: friedbread
Time: 21/12/18 07:05:03

New or changed rail incident notice:

Garner ID : 33616
TOC : NT
Title : Buses replace trains between Bolton / Wigan North Western and Preston from 21:50 on Saturday 23 until 09:00 on Sunday 24 February
Number / version : 67B47A2EC20B4C22BF4DE560F914239E / 20181221065800
Saturday from 21:50:

Trains between Manchester Airport / Manchester Victoria and Blackpool North will operate between Manchester and Bolton / Horwich Parkway, and between Preston and Blackpool North in both directions.

Trains between Liverpool Lime Street and Blackpool North will operate between Liverpool and Wigan North Western, and between Preston and Blackpool North in both directions.

Sunday until 09:00:

The 07:48 Blackpool North to Manchester Oxford Road will start from Bolton.
The 07:58 Manchester Piccadilly to Preston will terminate at Preston.
The 08:21 Blackpool North to Manchester Victoria will depart Preston at 09:03 and run later than normally advertised to Manchester Victoria (arriving at 09:55).
The 07:55 Blackpool North to Liverpool Lime Street will start from Wigan North Western. An additional train will operate from Blackpool North to Preston departing at 07:55. [524]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.