nw-sparks.co.uk

©2017 Phil Wieland

Engineering Works Detail

Sat 7th January 2012
Late Night Engineering Work Between Preston and Wigan / Blackrod

23:02 Blackpool North to Manchester Victoria will start from Horwich Parkway. A replacement bus will run between Blackpool North and Bolton.
23:02 Liverpool Lime Street to Preston will be diverted to terminate at Wigan Wallgate.
23:16 Manchester Victoria to Blackpool North will terminate at Horwich Parkway. A replacement bus will run between Bolton and Blackpool North. [66]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.