nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sun 22nd January 2012
Engineering Work Between Manchester Piccadilly and Salford Crescent

Trains between Manchester Piccadilly and Chester will be diverted via Stockport and Northwich.

Trains between Liverpool Lime Street and Manchester Airport will be diverted to start / terminate at Manchester Victoria and will no longer call at Manchester Oxford Road, Manchester Piccadilly and Manchester Airport.

Trains between Manchester Piccadilly and Chester will be diverted via Stockport and Northwich.

TransPennine Express services between Liverpool and Manchester and beyond will be diverted via Newton-le-Willows and Manchester Victoria with the following exceptions:
The 18:45 Middlesbrough to Liverpool Lime Street will terminate at Newton-le-Willows.
The 19:51 Scarborough to Liverpool Lime Street will terminate at Manchester Victoria. [70]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.