Train Service Performance at Huyton - November 2011
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 164 | 164 | (100.0%) | 116 | (70.7%) | 144 | (87.8%) | |
| 2 | 164 | 164 | (100.0%) | 124 | (75.6%) | 158 | (96.3%) | |
| 3 | 164 | 164 | (100.0%) | 118 | (72.0%) | 150 | (91.5%) | |
| 4 | 164 | 164 | (100.0%) | 97 | (59.1%) | 147 | (89.6%) | |
| 5 | 165 | 164 | (99.4%) | 115 | (69.7%) | 144 | (87.3%) |
Points failure at Huyton affected services 12:00 - 13:00.
|
| 6 | 62 | 62 | (100.0%) | 40 | (64.5%) | 53 | (85.5%) | |
| 7 | 166 | 166 | (100.0%) | 95 | (57.2%) | 143 | (86.1%) |
Signalling problems at Kirkham causing delays to Blackpool services. 08:00 - 13:00.
|
| 8 | 164 | 162 | (98.8%) | 112 | (68.3%) | 146 | (89.0%) | |
| 9 | 165 | 159 | (96.4%) | 106 | (64.2%) | 142 | (86.1%) |
Broken down train near Eccles caused disruption 13.30 - 15.30.
|
| 10 | 164 | 164 | (100.0%) | 101 | (61.6%) | 134 | (81.7%) | |
| 11 | 164 | 164 | (100.0%) | 117 | (71.3%) | 147 | (89.6%) | |
| 12 | 164 | 164 | (100.0%) | 115 | (70.1%) | 150 | (91.5%) | |
| 13 | 62 | 62 | (100.0%) | 42 | (67.7%) | 48 | (77.4%) |
Overrunning engineering works at Manchester Oxford Road, until 11:00.
|
| 14 | 162 | 162 | (100.0%) | 110 | (67.9%) | 144 | (88.9%) | |
| 15 | 163 | 163 | (100.0%) | 117 | (71.8%) | 151 | (92.6%) | |
| 16 | 162 | 162 | (100.0%) | 97 | (59.9%) | 134 | (82.7%) | |
| 17 | 162 | 162 | (100.0%) | 112 | (69.1%) | 148 | (91.4%) | |
| 18 | 164 | 163 | (99.4%) | 93 | (56.7%) | 141 | (86.0%) | |
| 19 | 164 | 164 | (100.0%) | 125 | (76.2%) | 162 | (98.8%) | |
| 20 | 62 | 62 | (100.0%) | 34 | (54.8%) | 42 | (67.7%) | |
| 21 | 162 | 160 | (98.8%) | 116 | (71.6%) | 153 | (94.4%) | |
| 22 | 163 | 160 | (98.2%) | 107 | (65.6%) | 144 | (88.3%) |
A signalling problem at Earlestown affected services 11:00 - 13.00.
|
| 23 | 162 | 162 | (100.0%) | 101 | (62.3%) | 140 | (86.4%) | |
| 24 | 162 | 162 | (100.0%) | 125 | (77.2%) | 152 | (93.8%) | |
| 25 | 164 | 162 | (98.8%) | 89 | (54.3%) | 135 | (82.3%) | |
| 26 | 164 | 164 | (100.0%) | 91 | (55.5%) | 136 | (82.9%) | |
| 27 | 69 | 69 | (100.0%) | 46 | (66.7%) | 57 | (82.6%) | |
| 28 | 164 | 163 | (99.4%) | 98 | (59.8%) | 128 | (78.0%) | |
| 29 | 166 | 164 | (98.8%) | 88 | (53.0%) | 126 | (75.9%) |
A broken down train at Garswood caused disruption 11:00 - 15:30.
|
| 30 | 164 | 164 | (100.0%) | 102 | (62.2%) | 152 | (92.7%) | |
| November | 4511 | 4491 | (99.6%) | 2949 | (65.4%) | 3951 | (87.6%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|