| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 164 | 161 | (98.2%) | 87 | (53.0%) | 139 | (84.8%) | |
| 2 | 164 | 164 | (100.0%) | 108 | (65.9%) | 145 | (88.4%) | |
| 3 | 164 | 164 | (100.0%) | 121 | (73.8%) | 151 | (92.1%) | |
| 4 | 70 | 70 | (100.0%) | 40 | (57.1%) | 58 | (82.9%) | |
| 5 | 164 | 161 | (98.2%) | 108 | (65.9%) | 146 | (89.0%) |
Electrical supply problems between Kirkham & Wesham and Poulton-le-Fylde 07:00 - 11.00.
Poor rail conditions in the Preston area 09:00 - 11.00.
|
| 6 | 164 | 162 | (98.8%) | 116 | (70.7%) | 153 | (93.3%) | |
| 7 | 164 | 163 | (99.4%) | 113 | (68.9%) | 146 | (89.0%) | |
| 8 | 164 | 163 | (99.4%) | 77 | (47.0%) | 128 | (78.0%) | |
| 9 | 164 | 162 | (98.8%) | 101 | (61.6%) | 139 | (84.8%) | |
| 10 | 164 | 163 | (99.4%) | 115 | (70.1%) | 151 | (92.1%) | |
| 11 | 66 | 66 | (100.0%) | 47 | (71.2%) | 59 | (89.4%) | |
| 12 | 163 | 163 | (100.0%) | 114 | (69.9%) | 150 | (92.0%) | |
| 13 | 163 | 163 | (100.0%) | 107 | (65.6%) | 150 | (92.0%) | |
| 14 | 163 | 163 | (100.0%) | 110 | (67.5%) | 155 | (95.1%) | |
| 15 | 163 | 163 | (100.0%) | 125 | (76.7%) | 156 | (95.7%) | |
| 16 | 165 | 154 | (93.3%) | 37 | (22.4%) | 65 | (39.4%) |
Problems north of Wigan affected some Blackpool services 08.00 - 09.30.
Signalling problem at Huyton 10:30 - 22.00.
|
| 17 | 163 | 162 | (99.4%) | 98 | (60.1%) | 140 | (85.9%) | |
| 18 | 66 | 66 | (100.0%) | 50 | (75.8%) | 57 | (86.4%) | |
| 19 | 163 | 163 | (100.0%) | 102 | (62.6%) | 136 | (83.4%) | |
| 20 | 163 | 160 | (98.2%) | 81 | (49.7%) | 129 | (79.1%) |
A broken down train at Edge Hill (Believed to be a Liverpool to Warrington Bank Quay service.) caused delays 09:30 - 11:45.
|
| 21 | 164 | 159 | (97.0%) | 87 | (53.0%) | 137 | (83.5%) | |
| 22 | 163 | 163 | (100.0%) | 113 | (69.3%) | 151 | (92.6%) | |
| 23 | 165 | 160 | (97.0%) | 76 | (46.1%) | 109 | (66.1%) |
Signalling problem at Edge Hill. Start of service - 13:00.
|
| 24 | 152 | 152 | (100.0%) | 145 | (95.4%) | 151 | (99.3%) | |
| 25 | 0 | 0 | (-%) | 0 | (-%) | 0 | (-%) | |
| 26 | 0 | 0 | (-%) | 0 | (-%) | 0 | (-%) | |
| 27 | 163 | 162 | (99.4%) | 137 | (84.0%) | 156 | (95.7%) | |
| 28 | 165 | 162 | (98.2%) | 115 | (69.7%) | 149 | (90.3%) |
Signalling problem at Warrington Bank Quay affecting Warrington and Manchester services. 09:00 - 12.30.
|
| 29 | 163 | 163 | (100.0%) | 149 | (91.4%) | 159 | (97.5%) | |
| 30 | 164 | 164 | (100.0%) | 140 | (85.4%) | 157 | (95.7%) | |
| 31 | 152 | 152 | (100.0%) | 119 | (78.3%) | 147 | (96.7%) | |
| December | 4435 | 4393 | (99.1%) | 2938 | (66.2%) | 3869 | (87.2%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|