©2026 Phil Wieland
|
Train Service Performance at Huyton - January 2012
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 59 | 59 | (100.0%) | 53 | (89.8%) | 58 | (98.3%) | |
| 2 | 161 | 160 | (99.4%) | 132 | (82.0%) | 152 | (94.4%) | |
| 3 | 161 | 161 | (100.0%) | 126 | (78.3%) | 156 | (96.9%) | |
| 4 | 161 | 161 | (100.0%) | 118 | (73.3%) | 146 | (90.7%) | |
| 5 | 161 | 161 | (100.0%) | 114 | (70.8%) | 137 | (85.1%) | |
| 6 | 160 | 159 | (99.4%) | 116 | (72.5%) | 143 | (89.4%) |
Internet connection down 20.05 - 22.27. Some data missing.
|
| 7 | 166 | 163 | (98.2%) | 139 | (83.7%) | 151 | (91.0%) | |
| 8 | 59 | 58 | (98.3%) | 43 | (72.9%) | 50 | (84.7%) | |
| 9 | 163 | 163 | (100.0%) | 136 | (83.4%) | 154 | (94.5%) | |
| 10 | 163 | 162 | (99.4%) | 126 | (77.3%) | 161 | (98.8%) | |
| 11 | 163 | 163 | (100.0%) | 126 | (77.3%) | 155 | (95.1%) | |
| 12 | 163 | 163 | (100.0%) | 128 | (78.5%) | 153 | (93.9%) | |
| 13 | 164 | 164 | (100.0%) | 143 | (87.2%) | 163 | (99.4%) | |
| 14 | 164 | 164 | (100.0%) | 132 | (80.5%) | 154 | (93.9%) | |
| 15 | 59 | 59 | (100.0%) | 41 | (69.5%) | 53 | (89.8%) | |
| 16 | 163 | 163 | (100.0%) | 118 | (72.4%) | 148 | (90.8%) | |
| 17 | 163 | 161 | (98.8%) | 123 | (75.5%) | 150 | (92.0%) | |
| 18 | 163 | 163 | (100.0%) | 130 | (79.8%) | 158 | (96.9%) | |
| 19 | 163 | 163 | (100.0%) | 123 | (75.5%) | 148 | (90.8%) | |
| 20 | 164 | 164 | (100.0%) | 117 | (71.3%) | 153 | (93.3%) | |
| 21 | 164 | 164 | (100.0%) | 142 | (86.6%) | 160 | (97.6%) | |
| 22 | 59 | 59 | (100.0%) | 44 | (74.6%) | 51 | (86.4%) | |
| 23 | 163 | 163 | (100.0%) | 108 | (66.3%) | 130 | (79.8%) |
A trespass incident at Wavertree Technology Park caused delays 20:00 - 22:00.
|
| 24 | 163 | 163 | (100.0%) | 138 | (84.7%) | 160 | (98.2%) | |
| 25 | 163 | 163 | (100.0%) | 130 | (79.8%) | 158 | (96.9%) | |
| 26 | 158 | 158 | (100.0%) | 122 | (77.2%) | 144 | (91.1%) |
Internet connection down 09:45 - 11:00. Some data missing.
|
| 27 | 164 | 164 | (100.0%) | 138 | (84.1%) | 157 | (95.7%) | |
| 28 | 164 | 162 | (98.8%) | 135 | (82.3%) | 151 | (92.1%) | |
| 29 | 59 | 59 | (100.0%) | 41 | (69.5%) | 52 | (88.1%) | |
| 30 | 163 | 163 | (100.0%) | 135 | (82.8%) | 158 | (96.9%) | |
| 31 | 163 | 163 | (100.0%) | 124 | (76.1%) | 148 | (90.8%) | |
| January | 4526 | 4515 | (99.8%) | 3541 | (78.2%) | 4212 | (93.1%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|