©2026 Phil Wieland
|
Train Service Performance at Huyton - September 2012
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 164 | 164 | (100.0%) | 133 | (81.1%) | 158 | (96.3%) | |
| 2 | 56 | 56 | (100.0%) | 47 | (83.9%) | 52 | (92.9%) | |
| 3 | 157 | 153 | (97.5%) | 128 | (81.5%) | 151 | (96.2%) | |
| 4 | 157 | 157 | (100.0%) | 128 | (81.5%) | 147 | (93.6%) | |
| 5 | 157 | 156 | (99.4%) | 122 | (77.7%) | 143 | (91.1%) | |
| 6 | 157 | 157 | (100.0%) | 127 | (80.9%) | 150 | (95.5%) | |
| 7 | 164 | 164 | (100.0%) | 137 | (83.5%) | 157 | (95.7%) | |
| 8 | 165 | 164 | (99.4%) | 139 | (84.2%) | 162 | (98.2%) | |
| 9 | 56 | 56 | (100.0%) | 46 | (82.1%) | 50 | (89.3%) | |
| 10 | 157 | 156 | (99.4%) | 122 | (77.7%) | 149 | (94.9%) | |
| 11 | 157 | 157 | (100.0%) | 135 | (86.0%) | 155 | (98.7%) | |
| 12 | 157 | 157 | (100.0%) | 124 | (79.0%) | 152 | (96.8%) | |
| 13 | 157 | 152 | (96.8%) | 121 | (77.1%) | 143 | (91.1%) | |
| 14 | 164 | 163 | (99.4%) | 120 | (73.2%) | 146 | (89.0%) |
Signalling problem between Manchester Victoria and Eccles affected services 10:00 to 11:00.
|
| 15 | 164 | 157 | (95.7%) | 127 | (77.4%) | 152 | (92.7%) | |
| 16 | 56 | 56 | (100.0%) | 42 | (75.0%) | 49 | (87.5%) |
Problem with lineside equipment between Manchester Piccadilly and Manchester Airport. 09:30 - 10:30.
|
| 17 | 157 | 157 | (100.0%) | 124 | (79.0%) | 149 | (94.9%) | |
| 18 | 157 | 156 | (99.4%) | 127 | (80.9%) | 149 | (94.9%) | |
| 19 | 157 | 157 | (100.0%) | 124 | (79.0%) | 151 | (96.2%) | |
| 20 | 157 | 157 | (100.0%) | 127 | (80.9%) | 153 | (97.5%) | |
| 21 | 164 | 164 | (100.0%) | 124 | (75.6%) | 153 | (93.3%) | |
| 22 | 164 | 163 | (99.4%) | 122 | (74.4%) | 144 | (87.8%) | |
| 23 | 54 | 53 | (98.1%) | 42 | (77.8%) | 51 | (94.4%) | |
| 24 | 157 | 144 | (91.7%) | 62 | (39.5%) | 90 | (57.3%) | |
| 25 | 157 | 155 | (98.7%) | 117 | (74.5%) | 144 | (91.7%) | |
| 26 | 157 | 152 | (96.8%) | 93 | (59.2%) | 128 | (81.5%) | |
| 27 | 157 | 154 | (98.1%) | 106 | (67.5%) | 131 | (83.4%) | |
| 28 | 164 | 164 | (100.0%) | 125 | (76.2%) | 152 | (92.7%) | |
| 29 | 164 | 163 | (99.4%) | 127 | (77.4%) | 151 | (92.1%) | |
| 30 | 56 | 56 | (100.0%) | 39 | (69.6%) | 54 | (96.4%) | |
| September | 4267 | 4220 | (98.9%) | 3257 | (76.3%) | 3916 | (91.8%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|