©2026 Phil Wieland
|
Train Service Performance at Huyton - October 2012
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 158 | 154 | (97.5%) | 99 | (62.7%) | 137 | (86.7%) |
Signalling problem at Edge Hill. 11:00 - 13:00.
|
| 2 | 157 | 157 | (100.0%) | 136 | (86.6%) | 154 | (98.1%) | |
| 3 | 157 | 155 | (98.7%) | 123 | (78.3%) | 150 | (95.5%) | |
| 4 | 157 | 156 | (99.4%) | 122 | (77.7%) | 144 | (91.7%) | |
| 5 | 164 | 161 | (98.2%) | 105 | (64.0%) | 150 | (91.5%) |
Incident at Poulton-le-Fylde. 12:50 - 14:20
|
| 6 | 164 | 162 | (98.8%) | 108 | (65.9%) | 139 | (84.8%) | |
| 7 | 56 | 56 | (100.0%) | 35 | (62.5%) | 48 | (85.7%) | |
| 8 | 158 | 157 | (99.4%) | 132 | (83.5%) | 149 | (94.3%) | |
| 9 | 157 | 155 | (98.7%) | 118 | (75.2%) | 143 | (91.1%) | |
| 10 | 157 | 157 | (100.0%) | 137 | (87.3%) | 153 | (97.5%) | |
| 11 | 157 | 157 | (100.0%) | 134 | (85.4%) | 154 | (98.1%) | |
| 12 | 164 | 164 | (100.0%) | 102 | (62.2%) | 156 | (95.1%) | |
| 13 | 164 | 163 | (99.4%) | 88 | (53.7%) | 149 | (90.9%) | |
| 14 | 56 | 56 | (100.0%) | 38 | (67.9%) | 46 | (82.1%) | |
| 15 | 157 | 155 | (98.7%) | 112 | (71.3%) | 144 | (91.7%) | |
| 16 | 157 | 157 | (100.0%) | 128 | (81.5%) | 154 | (98.1%) | |
| 17 | 157 | 156 | (99.4%) | 124 | (79.0%) | 146 | (93.0%) | |
| 18 | 158 | 157 | (99.4%) | 139 | (88.0%) | 153 | (96.8%) | |
| 19 | 164 | 163 | (99.4%) | 115 | (70.1%) | 140 | (85.4%) | |
| 20 | 164 | 164 | (100.0%) | 143 | (87.2%) | 162 | (98.8%) | |
| 21 | 56 | 56 | (100.0%) | 50 | (89.3%) | 56 | (100.0%) | |
| 22 | 157 | 148 | (94.3%) | 121 | (77.1%) | 146 | (93.0%) | |
| 23 | 157 | 157 | (100.0%) | 123 | (78.3%) | 148 | (94.3%) | |
| 24 | 157 | 155 | (98.7%) | 113 | (72.0%) | 143 | (91.1%) | |
| 25 | 157 | 156 | (99.4%) | 124 | (79.0%) | 150 | (95.5%) | |
| 26 | 164 | 164 | (100.0%) | 115 | (70.1%) | 150 | (91.5%) | |
| 27 | 163 | 161 | (98.8%) | 94 | (57.7%) | 135 | (82.8%) | |
| 28 | 57 | 57 | (100.0%) | 37 | (64.9%) | 48 | (84.2%) | |
| 29 | 157 | 157 | (100.0%) | 99 | (63.1%) | 143 | (91.1%) | |
| 30 | 157 | 153 | (97.5%) | 74 | (47.1%) | 116 | (73.9%) |
Broken down train on the up line at Thatto Heath caused delays and some cancellations. 13:00 - 17:00.
|
| 31 | 157 | 157 | (100.0%) | 85 | (54.1%) | 123 | (78.3%) | |
| October | 4522 | 4483 | (99.1%) | 3273 | (72.4%) | 4129 | (91.3%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|