©2026 Phil Wieland
|
Train Service Performance at Huyton - November 2012
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 158 | 158 | (100.0%) | 103 | (65.2%) | 140 | (88.6%) | |
| 2 | 165 | 165 | (100.0%) | 87 | (52.7%) | 128 | (77.6%) | |
| 3 | 164 | 164 | (100.0%) | 121 | (73.8%) | 154 | (93.9%) | |
| 4 | 56 | 56 | (100.0%) | 37 | (66.1%) | 48 | (85.7%) | |
| 5 | 157 | 157 | (100.0%) | 112 | (71.3%) | 142 | (90.4%) | |
| 6 | 160 | 155 | (96.9%) | 91 | (56.9%) | 127 | (79.4%) |
Signalling problem at Huyton 15:00 - 17:30.
|
| 7 | 157 | 155 | (98.7%) | 109 | (69.4%) | 139 | (88.5%) | |
| 8 | 158 | 158 | (100.0%) | 117 | (74.1%) | 149 | (94.3%) | |
| 9 | 164 | 163 | (99.4%) | 112 | (68.3%) | 146 | (89.0%) | |
| 10 | 164 | 163 | (99.4%) | 118 | (72.0%) | 152 | (92.7%) | |
| 11 | 57 | 57 | (100.0%) | 41 | (71.9%) | 50 | (87.7%) | |
| 12 | 157 | 155 | (98.7%) | 93 | (59.2%) | 117 | (74.5%) | |
| 13 | 157 | 155 | (98.7%) | 131 | (83.4%) | 151 | (96.2%) | |
| 14 | 157 | 155 | (98.7%) | 108 | (68.8%) | 143 | (91.1%) |
Broken down freight train near Leyland caused delays and cancellations. 06:30 - 10.30.
|
| 15 | 157 | 157 | (100.0%) | 119 | (75.8%) | 146 | (93.0%) | |
| 16 | 164 | 163 | (99.4%) | 113 | (68.9%) | 143 | (87.2%) | |
| 17 | 164 | 164 | (100.0%) | 124 | (75.6%) | 150 | (91.5%) | |
| 18 | 62 | 62 | (100.0%) | 42 | (67.7%) | 52 | (83.9%) | |
| 19 | 158 | 157 | (99.4%) | 77 | (48.7%) | 120 | (75.9%) | |
| 20 | 157 | 155 | (98.7%) | 91 | (58.0%) | 129 | (82.2%) | |
| 21 | 157 | 157 | (100.0%) | 106 | (67.5%) | 137 | (87.3%) | |
| 22 | 158 | 155 | (98.1%) | 80 | (50.6%) | 123 | (77.8%) |
Broken down train on down line at St Helens Central. 12:15 - 14:15.
|
| 23 | 164 | 164 | (100.0%) | 93 | (56.7%) | 139 | (84.8%) | |
| 24 | 164 | 162 | (98.8%) | 105 | (64.0%) | 146 | (89.0%) | |
| 25 | 62 | 62 | (100.0%) | 26 | (41.9%) | 39 | (62.9%) | |
| 26 | 157 | 157 | (100.0%) | 101 | (64.3%) | 142 | (90.4%) | |
| 27 | 157 | 157 | (100.0%) | 117 | (74.5%) | 147 | (93.6%) | |
| 28 | 159 | 116 | (73.0%) | 88 | (55.3%) | 103 | (64.8%) |
Signalling problem at Huyton, described by Northern Rail as a major power failure. Buses replaced trains between Liverpool and St Helens Central and Earlestown from 16:00 to end of service. Reports suggest the emergency generator failed to start.
Also safety checks of the up line at Eccles disrupted trains running Newton-le-Willows to Manchester 21:00 to 23:00.
|
| 29 | 157 | 138 | (87.9%) | 100 | (63.7%) | 129 | (82.2%) |
LDB system down 06:45 - 08:50. I have treated all affected trains as being on time.
|
| 30 | 164 | 164 | (100.0%) | 103 | (62.8%) | 141 | (86.0%) | |
| November | 4392 | 4306 | (98.0%) | 2865 | (65.2%) | 3772 | (85.9%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|