©2026 Phil Wieland
|
Train Service Performance at Huyton - April 2013
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 156 | 151 | (96.8%) | 129 | (82.7%) | 141 | (90.4%) | |
| 2 | 157 | 157 | (100.0%) | 138 | (87.9%) | 152 | (96.8%) | |
| 3 | 157 | 155 | (98.7%) | 132 | (84.1%) | 147 | (93.6%) | |
| 4 | 164 | 161 | (98.2%) | 108 | (65.9%) | 130 | (79.3%) |
A lineside fire at Garswood severely disrupted service late afternoon and early evening.
A signalling problem at Earlestown
|
| 5 | 167 | 166 | (99.4%) | 143 | (85.6%) | 157 | (94.0%) | |
| 6 | 164 | 161 | (98.2%) | 137 | (83.5%) | 151 | (92.1%) | |
| 7 | 56 | 56 | (100.0%) | 47 | (83.9%) | 50 | (89.3%) | |
| 8 | 156 | 156 | (100.0%) | 121 | (77.6%) | 148 | (94.9%) | |
| 9 | 157 | 157 | (100.0%) | 134 | (85.4%) | 154 | (98.1%) | |
| 10 | 157 | 157 | (100.0%) | 128 | (81.5%) | 149 | (94.9%) | |
| 11 | 157 | 156 | (99.4%) | 125 | (79.6%) | 145 | (92.4%) | |
| 12 | 164 | 162 | (98.8%) | 133 | (81.1%) | 154 | (93.9%) | |
| 13 | 167 | 152 | (91.0%) | 103 | (61.7%) | 119 | (71.3%) |
A signalling problem at Lime Street from 10:00 caused major disruption, with 15 cancellations. Normal service had resumed by about 17:00.
|
| 14 | 56 | 56 | (100.0%) | 51 | (91.1%) | 56 | (100.0%) | |
| 15 | 155 | 155 | (100.0%) | 140 | (90.3%) | 152 | (98.1%) | |
| 16 | 156 | 156 | (100.0%) | 134 | (85.9%) | 151 | (96.8%) | |
| 17 | 156 | 156 | (100.0%) | 144 | (92.3%) | 152 | (97.4%) | |
| 18 | 156 | 156 | (100.0%) | 126 | (80.8%) | 146 | (93.6%) | |
| 19 | 163 | 163 | (100.0%) | 138 | (84.7%) | 157 | (96.3%) | |
| 20 | 164 | 164 | (100.0%) | 128 | (78.0%) | 162 | (98.8%) | |
| 21 | 56 | 56 | (100.0%) | 54 | (96.4%) | 55 | (98.2%) | |
| 22 | 156 | 156 | (100.0%) | 150 | (96.2%) | 155 | (99.4%) | |
| 23 | 156 | 156 | (100.0%) | 131 | (84.0%) | 147 | (94.2%) | |
| 24 | 156 | 156 | (100.0%) | 144 | (92.3%) | 156 | (100.0%) | |
| 25 | 156 | 156 | (100.0%) | 136 | (87.2%) | 148 | (94.9%) | |
| 26 | 163 | 163 | (100.0%) | 136 | (83.4%) | 158 | (96.9%) | |
| 27 | 164 | 164 | (100.0%) | 144 | (87.8%) | 158 | (96.3%) | |
| 28 | 56 | 56 | (100.0%) | 55 | (98.2%) | 56 | (100.0%) | |
| 29 | 156 | 155 | (99.4%) | 138 | (88.5%) | 146 | (93.6%) | |
| 30 | 156 | 156 | (100.0%) | 121 | (77.6%) | 146 | (93.6%) | |
| April | 4360 | 4327 | (99.2%) | 3648 | (83.7%) | 4098 | (94.0%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|