Train Service Performance at Huyton - June 2013
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 98 | 98 | (100.0%) | 74 | (75.5%) | 89 | (90.8%) | |
| 2 | 56 | 55 | (98.2%) | 51 | (91.1%) | 54 | (96.4%) | |
| 3 | 158 | 158 | (100.0%) | 128 | (81.0%) | 149 | (94.3%) | |
| 4 | 159 | 153 | (96.2%) | 93 | (58.5%) | 120 | (75.5%) |
A broken down train at Broad Green caused delays and cancellations 08:50 to 11:00.
|
| 5 | 157 | 157 | (100.0%) | 115 | (73.2%) | 146 | (93.0%) | |
| 6 | 157 | 155 | (98.7%) | 121 | (77.1%) | 149 | (94.9%) | |
| 7 | 164 | 163 | (99.4%) | 125 | (76.2%) | 154 | (93.9%) | |
| 8 | 164 | 164 | (100.0%) | 118 | (72.0%) | 151 | (92.1%) | |
| 9 | 56 | 56 | (100.0%) | 51 | (91.1%) | 53 | (94.6%) | |
| 10 | 158 | 156 | (98.7%) | 122 | (77.2%) | 144 | (91.1%) | |
| 11 | 157 | 155 | (98.7%) | 132 | (84.1%) | 149 | (94.9%) | |
| 12 | 157 | 156 | (99.4%) | 118 | (75.2%) | 148 | (94.3%) | |
| 13 | 157 | 157 | (100.0%) | 129 | (82.2%) | 145 | (92.4%) | |
| 14 | 164 | 164 | (100.0%) | 136 | (82.9%) | 161 | (98.2%) | |
| 15 | 164 | 164 | (100.0%) | 147 | (89.6%) | 163 | (99.4%) | |
| 16 | 56 | 56 | (100.0%) | 46 | (82.1%) | 50 | (89.3%) | |
| 17 | 157 | 157 | (100.0%) | 144 | (91.7%) | 156 | (99.4%) | |
| 18 | 157 | 156 | (99.4%) | 124 | (79.0%) | 146 | (93.0%) |
Overhead wire problems at Eccles caused disruption 12:00 to 16:00.
|
| 19 | 157 | 157 | (100.0%) | 127 | (80.9%) | 148 | (94.3%) | |
| 20 | 157 | 157 | (100.0%) | 140 | (89.2%) | 150 | (95.5%) | |
| 21 | 165 | 165 | (100.0%) | 124 | (75.2%) | 149 | (90.3%) | |
| 22 | 99 | 99 | (100.0%) | 70 | (70.7%) | 94 | (94.9%) | |
| 23 | 56 | 56 | (100.0%) | 53 | (94.6%) | 56 | (100.0%) | |
| 24 | 157 | 152 | (96.8%) | 124 | (79.0%) | 147 | (93.6%) |
A signalling problem at Eccles caused disruption 06:30 to 09:00.
|
| 25 | 157 | 157 | (100.0%) | 139 | (88.5%) | 153 | (97.5%) | |
| 26 | 157 | 155 | (98.7%) | 122 | (77.7%) | 142 | (90.4%) |
A signalling problem at Earlestown caused some disruption 07:00 to 10:00.
|
| 27 | 157 | 157 | (100.0%) | 128 | (81.5%) | 150 | (95.5%) | |
| 28 | 155 | 155 | (100.0%) | 121 | (78.1%) | 141 | (91.0%) |
A power failure caused loss of data feed 13:00 to 14:45.
|
| 29 | 164 | 164 | (100.0%) | 140 | (85.4%) | 158 | (96.3%) | |
| 30 | 56 | 56 | (100.0%) | 49 | (87.5%) | 51 | (91.1%) | |
| June | 4133 | 4110 | (99.4%) | 3311 | (80.1%) | 3866 | (93.5%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|