©2026 Phil Wieland
|
Train Service Performance at Huyton - July 2013
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 157 | 157 | (100.0%) | 122 | (77.7%) | 140 | (89.2%) | |
| 2 | 157 | 157 | (100.0%) | 143 | (91.1%) | 153 | (97.5%) | |
| 3 | 157 | 157 | (100.0%) | 141 | (89.8%) | 152 | (96.8%) | |
| 4 | 157 | 156 | (99.4%) | 129 | (82.2%) | 154 | (98.1%) | |
| 5 | 164 | 164 | (100.0%) | 136 | (82.9%) | 157 | (95.7%) | |
| 6 | 164 | 164 | (100.0%) | 126 | (76.8%) | 156 | (95.1%) | |
| 7 | 56 | 54 | (96.4%) | 42 | (75.0%) | 50 | (89.3%) |
A broken down train at Thatto Heath caused disruption 12:00 to 13:00.
|
| 8 | 157 | 157 | (100.0%) | 129 | (82.2%) | 151 | (96.2%) | |
| 9 | 157 | 157 | (100.0%) | 98 | (62.4%) | 132 | (84.1%) | |
| 10 | 157 | 157 | (100.0%) | 127 | (80.9%) | 144 | (91.7%) | |
| 11 | 157 | 157 | (100.0%) | 126 | (80.3%) | 150 | (95.5%) | |
| 12 | 162 | 162 | (100.0%) | 122 | (75.3%) | 147 | (90.7%) | |
| 13 | 137 | 134 | (97.8%) | 101 | (73.7%) | 128 | (93.4%) | |
| 14 | 56 | 55 | (98.2%) | 44 | (78.6%) | 50 | (89.3%) | |
| 15 | 130 | 130 | (100.0%) | 104 | (80.0%) | 128 | (98.5%) | |
| 16 | 130 | 128 | (98.5%) | 105 | (80.8%) | 114 | (87.7%) |
A signalling problem, at Earlestown caused disruption 08:00 to 10:00.
|
| 17 | 130 | 130 | (100.0%) | 114 | (87.7%) | 128 | (98.5%) | |
| 18 | 130 | 130 | (100.0%) | 102 | (78.5%) | 117 | (90.0%) | |
| 19 | 137 | 137 | (100.0%) | 89 | (65.0%) | 104 | (75.9%) | |
| 20 | 137 | 137 | (100.0%) | 117 | (85.4%) | 135 | (98.5%) | |
| 21 | 56 | 56 | (100.0%) | 54 | (96.4%) | 56 | (100.0%) | |
| 22 | 159 | 159 | (100.0%) | 132 | (83.0%) | 152 | (95.6%) | |
| 23 | 157 | 152 | (96.8%) | 96 | (61.1%) | 122 | (77.7%) | |
| 24 | 158 | 158 | (100.0%) | 122 | (77.2%) | 142 | (89.9%) | |
| 25 | 157 | 157 | (100.0%) | 135 | (86.0%) | 153 | (97.5%) | |
| 26 | 164 | 164 | (100.0%) | 128 | (78.0%) | 151 | (92.1%) | |
| 27 | 164 | 163 | (99.4%) | 140 | (85.4%) | 159 | (97.0%) | |
| 28 | 57 | 56 | (98.2%) | 43 | (75.4%) | 50 | (87.7%) | |
| 29 | 157 | 157 | (100.0%) | 117 | (74.5%) | 143 | (91.1%) | |
| 30 | 157 | 152 | (96.8%) | 120 | (76.4%) | 145 | (92.4%) | |
| 31 | 157 | 157 | (100.0%) | 126 | (80.3%) | 146 | (93.0%) | |
| July | 4332 | 4311 | (99.5%) | 3430 | (79.2%) | 4009 | (92.5%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|