Train Service Performance at Huyton - September 2013
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| 1 | 56 | 56 | (100.0%) | 50 | (89.3%) | 56 | (100.0%) | |
| 2 | 157 | 155 | (98.7%) | 113 | (72.0%) | 139 | (88.5%) | |
| 3 | 158 | 158 | (100.0%) | 130 | (82.3%) | 154 | (97.5%) | |
| 4 | 157 | 157 | (100.0%) | 135 | (86.0%) | 153 | (97.5%) | |
| 5 | 157 | 157 | (100.0%) | 140 | (89.2%) | 151 | (96.2%) | |
| 6 | 164 | 164 | (100.0%) | 121 | (73.8%) | 142 | (86.6%) | |
| 7 | 164 | 164 | (100.0%) | 133 | (81.1%) | 148 | (90.2%) | |
| 8 | 56 | 56 | (100.0%) | 47 | (83.9%) | 52 | (92.9%) | |
| 9 | 157 | 155 | (98.7%) | 122 | (77.7%) | 143 | (91.1%) | |
| 10 | 157 | 155 | (98.7%) | 124 | (79.0%) | 147 | (93.6%) | |
| 11 | 157 | 156 | (99.4%) | 140 | (89.2%) | 150 | (95.5%) | |
| 12 | 157 | 156 | (99.4%) | 127 | (80.9%) | 147 | (93.6%) | |
| 13 | 164 | 162 | (98.8%) | 114 | (69.5%) | 138 | (84.1%) |
Down line blocked at Lea Green 17:30 - 19:30.
|
| 14 | 164 | 163 | (99.4%) | 150 | (91.5%) | 163 | (99.4%) | |
| 15 | 56 | 56 | (100.0%) | 51 | (91.1%) | 56 | (100.0%) | |
| 16 | 157 | 157 | (100.0%) | 135 | (86.0%) | 149 | (94.9%) | |
| 17 | 157 | 157 | (100.0%) | 144 | (91.7%) | 155 | (98.7%) | |
| 18 | 159 | 159 | (100.0%) | 107 | (67.3%) | 132 | (83.0%) |
Signalling problem at Preston caused severe delays 10:30 - 12:00.
|
| 19 | 161 | 115 | (71.4%) | 52 | (32.3%) | 65 | (40.4%) |
Signalling problem at Edge Hill caused major disruptions with many trains cancelled from start of service until 17:00. Reportedly a tamper severed a cable.
|
| 20 | 164 | 164 | (100.0%) | 131 | (79.9%) | 161 | (98.2%) | |
| 21 | 164 | 164 | (100.0%) | 134 | (81.7%) | 162 | (98.8%) | |
| 22 | 56 | 56 | (100.0%) | 45 | (80.4%) | 54 | (96.4%) | |
| 23 | 157 | 157 | (100.0%) | 134 | (85.4%) | 151 | (96.2%) | |
| 24 | 157 | 157 | (100.0%) | 139 | (88.5%) | 155 | (98.7%) | |
| 25 | 158 | 157 | (99.4%) | 123 | (77.8%) | 138 | (87.3%) | |
| 26 | 157 | 156 | (99.4%) | 115 | (73.2%) | 144 | (91.7%) | |
| 27 | 164 | 164 | (100.0%) | 116 | (70.7%) | 146 | (89.0%) | |
| 28 | 164 | 164 | (100.0%) | 128 | (78.0%) | 159 | (97.0%) | |
| 29 | 56 | 56 | (100.0%) | 50 | (89.3%) | 53 | (94.6%) | |
| 30 | 157 | 157 | (100.0%) | 127 | (80.9%) | 148 | (94.3%) | |
| September | 4269 | 4210 | (98.6%) | 3377 | (79.1%) | 3911 | (91.6%) | |
Notes
- The figures are derived from the public live departure board systems. These do not always correspond precisely to actual train running.
- Trains cancelled by planned engineering works are not counted as a cancellation. (As long as they are removed from the departure board system.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|