©2026 Phil Wieland
|
Train Service Performance at Huyton - October 2017
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| Sunday 01 | 0 | 0 | | 0 | | 0 | | |
| Monday 02 | 0 | 0 | | 0 | | 0 | | |
| Tuesday 03 | 0 | 0 | | 0 | | 0 | | |
| Wednesday 04 | 0 | 0 | | 0 | | 0 | | |
| Thursday 05 | 0 | 0 | | 0 | | 0 | | |
| Friday 06 | 0 | 0 | | 0 | | 0 | | |
| Saturday 07 | 0 | 0 | | 0 | | 0 | | |
| Sunday 08 | 0 | 0 | | 0 | | 0 | | |
| Monday 09 | 124 | 109 | (87.9%) | 51 | (41.1%) | 81 | (65.3%) | |
| Tuesday 10 | 124 | 119 | (95.9%) | 83 | (66.9%) | 111 | (89.5%) | |
| Wednesday 11 | 124 | 122 | (98.3%) | 69 | (55.6%) | 98 | (79.0%) | |
| Thursday 12 | 123 | 123 | (100.0%) | 99 | (80.4%) | 119 | (96.7%) | |
| Friday 13 | 123 | 123 | (100.0%) | 86 | (69.9%) | 107 | (86.9%) | |
| Saturday 14 | 123 | 123 | (100.0%) | 83 | (67.4%) | 100 | (81.3%) | |
| Sunday 15 | 55 | 53 | (96.3%) | 39 | (70.9%) | 49 | (89.0%) | |
| Monday 16 | 123 | 117 | (95.1%) | 56 | (45.5%) | 98 | (79.6%) | |
| Tuesday 17 | 123 | 122 | (99.1%) | 84 | (68.2%) | 111 | (90.2%) | |
| Wednesday 18 | 123 | 121 | (98.3%) | 68 | (55.2%) | 96 | (78.0%) | |
| Thursday 19 | 123 | 123 | (100.0%) | 79 | (64.2%) | 109 | (88.6%) | |
| Friday 20 | 123 | 121 | (98.3%) | 84 | (68.2%) | 109 | (88.6%) | |
| Saturday 21 | 71 | 71 | (100.0%) | 62 | (87.3%) | 64 | (90.1%) | |
| Sunday 22 | 33 | 33 | (100.0%) | 30 | (90.9%) | 32 | (96.9%) | |
| Monday 23 | 162 | 156 | (96.2%) | 48 | (29.6%) | 94 | (58.0%) | First day of the interim layout at Lime Street. A signalling problem at Edge Hill made a mess of things between 11:30 and 15:00. |
| Tuesday 24 | 162 | 157 | (96.9%) | 79 | (48.7%) | 130 | (80.2%) | |
| Wednesday 25 | 162 | 162 | (100.0%) | 119 | (73.4%) | 152 | (93.8%) | |
| Thursday 26 | 162 | 159 | (98.1%) | 104 | (64.1%) | 136 | (83.9%) | |
| Friday 27 | 162 | 162 | (100.0%) | 98 | (60.4%) | 138 | (85.1%) | |
| Saturday 28 | 165 | 165 | (100.0%) | 86 | (52.1%) | 138 | (83.6%) | |
| Sunday 29 | 62 | 53 | (85.4%) | 17 | (27.4%) | 31 | (50.0%) | A broken down train at Broad Green, believed to be 2A02 08:12 Liverpool Lime Street to Manchester Airport, caused delays and cancellations for a few hours. |
| Monday 30 | 162 | 154 | (95.0%) | 92 | (56.7%) | 121 | (74.6%) | |
| Tuesday 31 | 162 | 157 | (96.9%) | 95 | (58.6%) | 115 | (70.9%) | A signalling fault at Lime Street was responsible for two cancellations and numerous delays between 15:30 and 19:00. The fault reocurred later in the evening. |
| Month | 2876 | 2805 | (97.5%) | 1782 | (61.9%) | 2410 | (83.7%) | |
Notes
- The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
- Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|