DateScheduledTrains RunOn TimeWithin 5 min.Comments
Thursday 01118117(99.1%)108(91.5%)115(97.4%) 
Friday 02118118(100.0%)101(85.5%)111(94.0%) 
Saturday 03115114(99.1%)91(79.1%)104(90.4%) 
Sunday 046355(87.3%)46(73.0%)51(80.9%) 
Monday 05119119(100.0%)103(86.5%)116(97.4%) 
Tuesday 06119118(99.1%)84(70.5%)98(82.3%) 
Wednesday 07119118(99.1%)104(87.3%)110(92.4%) 
Thursday 08119117(98.3%)100(84.0%)110(92.4%) 
Friday 09119116(97.4%)102(85.7%)112(94.1%) 
Saturday 10115115(100.0%)97(84.3%)110(95.6%) 
Sunday 111616(100.0%)9(56.2%)11(68.7%)A combination of Covid isolation and a football match resulted in most trains being removed from the schedule.
Monday 12117116(99.1%)96(82.0%)110(94.0%) 
Tuesday 13117112(95.7%)94(80.3%)101(86.3%)A "points failure" east of Edge Hill blocked lines in both directions. Disruption was from 11:15 until 13:30.
Wednesday 14117117(100.0%)106(90.5%)114(97.4%) 
Thursday 15117114(97.4%)100(85.4%)113(96.5%) 
Friday 16119116(97.4%)97(81.5%)108(90.7%) 
Saturday 17115111(96.5%)90(78.2%)105(91.3%) 
Sunday 186361(96.8%)52(82.5%)59(93.6%) 
Monday 19116107(92.2%)77(66.3%)85(73.2%)A broken down train in the vicinity of Wavertree resulted in cancellations and delays between 16:30 and 19:30.
Tuesday 20115113(98.2%)88(76.5%)105(91.3%) 
Wednesday 21115115(100.0%)101(87.8%)110(95.6%) 
Thursday 22115114(99.1%)95(82.6%)109(94.7%) 
Friday 23118115(97.4%)86(72.8%)100(84.7%) 
Saturday 24115114(99.1%)99(86.0%)110(95.6%) 
Sunday 256356(88.8%)41(65.0%)50(79.3%) 
Monday 26119118(99.1%)107(89.9%)115(96.6%) 
Tuesday 27118118(100.0%)102(86.4%)114(96.6%) 
Wednesday 28118117(99.1%)95(80.5%)109(92.3%) 
Thursday 29119119(100.0%)101(84.8%)114(95.7%) 
Friday 30118118(100.0%)103(87.2%)116(98.3%) 
Saturday 31115115(100.0%)92(80.0%)109(94.7%) 
Month33693309(98.2%)2827(83.9%)3164(93.9%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Rail replacement buses are not counted, since running information is not available.
  4. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.