DateScheduledTrains RunOn TimeWithin 5 min.Comments
Thursday 01148147(99.3%)114(77.0%)132(89.1%) 
Friday 02148135(91.2%)108(72.9%)117(79.0%) 
Saturday 03146132(90.4%)118(80.8%)127(86.9%) 
Sunday 046333(52.3%)28(44.4%)31(49.2%) 
Monday 05148133(89.8%)109(73.6%)122(82.4%) 
Tuesday 06148128(86.4%)106(71.6%)117(79.0%) 
Wednesday 07148147(99.3%)136(91.8%)143(96.6%) 
Thursday 08149140(93.9%)110(73.8%)127(85.2%) 
Friday 09148142(95.9%)116(78.3%)128(86.4%) 
Saturday 10146125(85.6%)101(69.1%)114(78.0%) 
Sunday 116335(55.5%)21(33.3%)26(41.2%) 
Monday 12148140(94.5%)111(75.0%)122(82.4%) 
Tuesday 13148142(95.9%)127(85.8%)139(93.9%) 
Wednesday 14148140(94.5%)106(71.6%)119(80.4%) 
Thursday 15148146(98.6%)118(79.7%)129(87.1%) 
Friday 16149145(97.3%)123(82.5%)132(88.5%) 
Saturday 17147139(94.5%)120(81.6%)131(89.1%) 
Sunday 186340(63.4%)28(44.4%)34(53.9%) 
Monday 19144140(97.2%)98(68.0%)115(79.8%) 
Tuesday 20143140(97.9%)102(71.3%)122(85.3%) 
Wednesday 21143141(98.6%)117(81.8%)128(89.5%) 
Thursday 22143121(84.6%)82(57.3%)94(65.7%)A points failure at Edge Hill caused major disruption from start of service.
Friday 2314869(46.6%)23(15.5%)30(20.2%)Damage to the overhead wires between Wigan and Bryn closed the line from 06:30 until about 17:00, with disruption continuing until close of service.
Saturday 24147115(78.2%)73(49.6%)90(61.2%)A tree on the railway between St Helens and Garswood blocked the lines from 08:00 to about 11:00, with disruption into the afternoon.
Sunday 256331(49.2%)19(30.1%)26(41.2%) 
Monday 26146106(72.6%)71(48.6%)84(57.5%)Damage to the overhead wires near Newton-le-Willows at about 17:00 combined with a power failure near Bryn to severely disrupt the service for the remainder of the day.
Tuesday 27146134(91.7%)87(59.5%)98(67.1%) 
Wednesday 28146144(98.6%)114(78.0%)126(86.3%) 
Thursday 29148138(93.2%)111(75.0%)126(85.1%) 
Friday 30148143(96.6%)104(70.2%)126(85.1%) 
Saturday 31146135(92.4%)109(74.6%)125(85.6%) 
Month42173746(88.8%)2910(69.0%)3280(77.7%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Trains cancelled via the VSTP (Very Short Term Planning) process are counted as a cancellation.
  4. Rail replacement buses are not counted, since running information is not available.
  5. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.