DateScheduledTrains RunOn TimeWithin 5 min.Comments
Sunday 016234(54.8%)20(32.2%)28(45.1%) 
Monday 02148146(98.6%)117(79.0%)132(89.1%) 
Tuesday 03148147(99.3%)116(78.3%)133(89.8%) 
Wednesday 04148144(97.2%)109(73.6%)127(85.8%) 
Thursday 05149128(85.9%)107(71.8%)119(79.8%)A problem with the overhead lines near Wigan and another problem with the wires near Deansgate wrecked the service from about 20:30.
Friday 06148147(99.3%)107(72.2%)125(84.4%) 
Saturday 07147142(96.5%)103(70.0%)116(78.9%) 
Sunday 086321(33.3%)12(19.0%)18(28.5%) 
Monday 09148132(89.1%)92(62.1%)112(75.6%) 
Tuesday 10148142(95.9%)114(77.0%)130(87.8%) 
Wednesday 11148135(91.2%)121(81.7%)130(87.8%) 
Thursday 12148135(91.2%)108(72.9%)120(81.0%) 
Friday 13148128(86.4%)102(68.9%)112(75.6%) 
Saturday 14146139(95.2%)100(68.4%)110(75.3%) 
Sunday 156330(47.6%)27(42.8%)28(44.4%) 
Monday 16148139(93.9%)106(71.6%)127(85.8%) 
Tuesday 17148139(93.9%)108(72.9%)123(83.1%) 
Wednesday 18148134(90.5%)93(62.8%)113(76.3%) 
Thursday 19148133(89.8%)104(70.2%)122(82.4%) 
Friday 20148138(93.2%)107(72.2%)121(81.7%) 
Saturday 21146134(91.7%)107(73.2%)119(81.5%) 
Sunday 226334(53.9%)17(26.9%)26(41.2%) 
Monday 23148143(96.6%)108(72.9%)127(85.8%) 
Tuesday 24148141(95.2%)103(69.5%)121(81.7%) 
Wednesday 25148142(95.9%)120(81.0%)127(85.8%) 
Thursday 26148132(89.1%)102(68.9%)114(77.0%) 
Friday 27148146(98.6%)115(77.7%)127(85.8%) 
Saturday 28146145(99.3%)101(69.1%)114(78.0%) 
Sunday 296319(30.1%)11(17.4%)13(20.6%)In what I think is the worst Sunday so far, two thirds of today's trains were "pre-cancelled" on Friday evening, with another two cancelled on the day.
Monday 30144136(94.4%)77(53.4%)86(59.7%)Flooding between Wigan and St Helens and other problems due to wet weather resulted in major disruption from 17:30 until close of service.
Month40043605(90.0%)2734(68.2%)3120(77.9%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Trains cancelled via the VSTP (Very Short Term Planning) process are counted as a cancellation.
  4. Rail replacement buses are not counted, since running information is not available.
  5. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.