Train Service Performance at Huyton - December 2024

DateScheduledTrains RunOn TimeWithin 5 min.Comments
Sunday 016320(31.7%)8(12.6%)14(22.2%) 
Monday 02148137(92.5%)105(70.9%)120(81.0%) 
Tuesday 03148140(94.5%)106(71.6%)120(81.0%) 
Wednesday 04148121(81.7%)79(53.3%)95(64.1%) 
Thursday 05149119(79.8%)71(47.6%)83(55.7%) 
Friday 06148135(91.2%)87(58.7%)107(72.2%) 
Saturday 0714673(50.0%)42(28.7%)55(37.6%) 
Sunday 086315(23.8%)13(20.6%)14(22.2%) 
Monday 09148131(88.5%)93(62.8%)113(76.3%) 
Tuesday 10148115(77.7%)89(60.1%)96(64.8%) 
Wednesday 11148136(91.8%)109(73.6%)118(79.7%) 
Thursday 12148131(88.5%)106(71.6%)123(83.1%) 
Friday 13149128(85.9%)84(56.3%)101(67.7%) 
Saturday 14146134(91.7%)93(63.6%)109(74.6%) 
Sunday 156514(21.5%)7(10.7%)11(16.9%) 
Monday 16149138(92.6%)108(72.4%)119(79.8%) 
Tuesday 17148130(87.8%)102(68.9%)114(77.0%) 
Wednesday 18148124(83.7%)80(54.0%)104(70.2%) 
Thursday 19148113(76.3%)74(50.0%)89(60.1%)A tree on the line between Huyton and Wigan closed the line from about 14:00 until 17:30, with disruption for the remainder of the day exacerbated from 20:45 by a signal failure at Leyland.
Friday 20148126(85.1%)93(62.8%)108(72.9%) 
Saturday 21146123(84.2%)99(67.8%)112(76.7%) 
Sunday 223226(81.2%)19(59.3%)21(65.6%) 
Monday 23144116(80.5%)65(45.1%)81(56.2%)A problem between Huyton and Wigan variously described as a broken down train or an overhead wire defect caused cancellations and disruption from 20:30.
Tuesday 24126110(87.3%)99(78.5%)101(80.1%) 
Wednesday 2500 0 0  
Thursday 2600 0 0  
Friday 27137105(76.6%)77(56.2%)90(65.6%) 
Saturday 28146119(81.5%)101(69.1%)109(74.6%) 
Sunday 293226(81.2%)17(53.1%)21(65.6%) 
Monday 30146137(93.8%)115(78.7%)126(86.3%) 
Tuesday 31125112(89.6%)92(73.6%)98(78.4%) 
Month37403054(81.6%)2233(59.7%)2572(68.7%) 

Notes
  1. The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
  2. Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
  3. Trains cancelled via the VSTP (Very Short Term Planning) process are counted as a cancellation.
  4. Rail replacement buses are not counted, since running information is not available.
  5. Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.