©2026 Phil Wieland
|
Train Service Performance at Huyton - January 2025
| Date | Scheduled | Trains Run | On Time | Within 5 min. | Comments |
| Wednesday 01 | 95 | 50 | (52.6%) | 38 | (40.0%) | 41 | (43.1%) | Flooding and other problems wrecked the service, with no trans at all until after 10:00 and multiple cancellations for the remainder of the day. |
| Thursday 02 | 149 | 147 | (98.6%) | 104 | (69.7%) | 121 | (81.2%) | |
| Friday 03 | 148 | 148 | (100.0%) | 119 | (80.4%) | 127 | (85.8%) | |
| Saturday 04 | 147 | 147 | (100.0%) | 125 | (85.0%) | 138 | (93.8%) | |
| Sunday 05 | 32 | 15 | (46.8%) | 12 | (37.5%) | 14 | (43.7%) | The day began with cancellations due to crew shortages even on the "emergency" reduced timetable. Then an overhead line fault between St Helens Central and Huyton closed the line from 10:00 until about 21:00. No diversions via Earlestown were attempted. |
| Monday 06 | 148 | 142 | (95.9%) | 89 | (60.1%) | 109 | (73.6%) | |
| Tuesday 07 | 148 | 134 | (90.5%) | 101 | (68.2%) | 118 | (79.7%) | A bridge strike between Newton-le-Willows and Manchester caused delays and cancellations from 08:00 until about noon. |
| Wednesday 08 | 148 | 144 | (97.2%) | 102 | (68.9%) | 120 | (81.0%) | |
| Thursday 09 | 148 | 138 | (93.2%) | 95 | (64.1%) | 115 | (77.7%) | |
| Friday 10 | 148 | 146 | (98.6%) | 92 | (62.1%) | 114 | (77.0%) | |
| Saturday 11 | 147 | 126 | (85.7%) | 88 | (59.8%) | 104 | (70.7%) | Problems started with a broken down train at Newton-le-Willows at about 06:20, believed to be 2F13 05:32 Manchester Airport to Liverpool Lime Street. The failed train was moved after about thirty minutes.
Then a points failure in the Springs Branch Junction area at about 07:30 closed the line until about 12:00, causing cancellations and diversions.
Thirdly, 1F02 07:05 Blackpool North to Liverpool Lime Street sat down at Huyton at 08:15, eventually departing empty shortly before 09:30.
Things returned to normal by about 13:00. |
| Sunday 12 | 34 | 28 | (82.3%) | 20 | (58.8%) | 24 | (70.5%) | Multiple overrunning engineering works meant the even the reduced "emergency" timetable suffered multiple cancellations until 11:30. |
| Monday 13 | 148 | 144 | (97.2%) | 110 | (74.3%) | 126 | (85.1%) | |
| Tuesday 14 | 148 | 143 | (96.6%) | 119 | (80.4%) | 131 | (88.5%) | |
| Wednesday 15 | 148 | 146 | (98.6%) | 115 | (77.7%) | 132 | (89.1%) | |
| Thursday 16 | 151 | 148 | (98.0%) | 111 | (73.5%) | 125 | (82.7%) | |
| Friday 17 | 150 | 139 | (92.6%) | 114 | (76.0%) | 130 | (86.6%) | |
| Saturday 18 | 147 | 147 | (100.0%) | 129 | (87.7%) | 141 | (95.9%) | |
| Sunday 19 | 0 | 0 | | 0 | | 0 | | |
| Monday 20 | 148 | 144 | (97.2%) | 118 | (79.7%) | 129 | (87.1%) | |
| Tuesday 21 | 148 | 136 | (91.8%) | 91 | (61.4%) | 106 | (71.6%) | A trespass incident between Huyton and St Helens Central caused delays, cancellations and diversions between 18:00 and 20:30. |
| Wednesday 22 | 148 | 148 | (100.0%) | 121 | (81.7%) | 135 | (91.2%) | |
| Thursday 23 | 148 | 148 | (100.0%) | 113 | (76.3%) | 132 | (89.1%) | |
| Friday 24 | 148 | 142 | (95.9%) | 74 | (50.0%) | 87 | (58.7%) | |
| Saturday 25 | 124 | 122 | (98.3%) | 99 | (79.8%) | 113 | (91.1%) | |
| Sunday 26 | 32 | 25 | (78.1%) | 23 | (71.8%) | 24 | (75.0%) | |
| Monday 27 | 148 | 142 | (95.9%) | 112 | (75.6%) | 130 | (87.8%) | |
| Tuesday 28 | 148 | 147 | (99.3%) | 127 | (85.8%) | 140 | (94.5%) | |
| Wednesday 29 | 148 | 141 | (95.2%) | 113 | (76.3%) | 128 | (86.4%) | |
| Thursday 30 | 148 | 145 | (97.9%) | 113 | (76.3%) | 130 | (87.8%) | |
| Friday 31 | 148 | 141 | (95.2%) | 104 | (70.2%) | 124 | (83.7%) | |
| Month | 4020 | 3813 | (94.8%) | 2891 | (71.9%) | 3308 | (82.2%) | |
Notes
- The figures are derived from information of Network Rail Infrastructure Limited licensed under this licence.
- Trains cancelled by planned engineering works or industrial action are not counted as a cancellation. (As long as they are removed from the timetable.)
- Trains cancelled via the VSTP (Very Short Term Planning) process are counted as a cancellation.
- Rail replacement buses are not counted, since running information is not available.
- Trains running within two minutes of correct time are deemed to be on time. I also show trains within five minutes, the railway's standard.
|